Search

First prototype installed at Landsnet's high voltage line

Updated: Oct 22, 2019

Laki Power, together with its partner the Icelandic TSO Landsnet, installed its first prototype on Landsnet’s Brennimelslína in the vicinity of Reykjavik, Iceland. The prototype is made from aluminium and is equipped with on-board tilt sensor, heat sensor, salinity sensor, 360° high resolution camera, and a GSM modem. 



System software allows for continuous monitoring and database storage of measured parameters as well as access to the live camera feed. A second prototype will be installed on Landsnet’s line in the coming months.

115 views0 comments

Recent Posts

See All